{"id":1437,"date":"2022-07-26T16:03:39","date_gmt":"2022-07-26T16:03:39","guid":{"rendered":"https:\/\/startersites.io\/elementor\/bizconsult\/?page_id=3"},"modified":"2026-08-05T11:47:34","modified_gmt":"2026-08-05T11:47:34","slug":"water-transmission-lines","status":"publish","type":"page","link":"https:\/\/reihani.dk\/index.php\/experiences\/water-transmission-lines\/","title":{"rendered":""},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"1437\" class=\"elementor elementor-1437\">\n\t\t\t\t<div class=\"elementor-element elementor-element-494e532a e-flex e-con-boxed e-con e-parent\" data-id=\"494e532a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1fa458f6 elementor-widget elementor-widget-text-editor\" data-id=\"1fa458f6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p><strong>Water Transmission Lines<\/strong><strong>:<\/strong><\/p><ul><li>Detailed design (implementation phase) of river training works in the Dareh Roud River<\/li><li>Design of water transmission lines from Dareh Tang to Maghar Dam, Ahar County<\/li><li>Phase III (high-level and site supervision) of the rehabilitation and reconstruction project of the feeder canal and main downstream irrigation network of Azadegan Dam, Ahar<\/li><li>Phase III (high-level and site supervision) of the water transfer project from Dareh Tang to Maghar Dam, Ahar County<\/li><li>Phase I and II studies for the design of the Tashtashi diversion weir on the Marduq Chay River<\/li><li>Phase II studies for the design of the drainage system of Shahid Salimi Industrial Town<\/li><li>Phase I and II studies for the surface water collection and conveyance project in Hashtrood Industrial Town<\/li><li>Studies and design of surface water management and flood conveyance in Hadi Shahr Industrial Town<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Water Transmission Lines: Detailed design (implementation phase) of river training works in the Dareh Roud River Design of water transmission lines from Dareh Tang to Maghar Dam, Ahar County Phase III (high-level and site supervision) of the rehabilitation and reconstruction project of the feeder canal and main downstream irrigation network of Azadegan Dam, Ahar Phase [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":793,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-1437","page","type-page","status-publish","hentry"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":8}},"_links":{"self":[{"href":"https:\/\/reihani.dk\/index.php\/wp-json\/wp\/v2\/pages\/1437","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/reihani.dk\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/reihani.dk\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/reihani.dk\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/reihani.dk\/index.php\/wp-json\/wp\/v2\/comments?post=1437"}],"version-history":[{"count":21,"href":"https:\/\/reihani.dk\/index.php\/wp-json\/wp\/v2\/pages\/1437\/revisions"}],"predecessor-version":[{"id":6246,"href":"https:\/\/reihani.dk\/index.php\/wp-json\/wp\/v2\/pages\/1437\/revisions\/6246"}],"up":[{"embeddable":true,"href":"https:\/\/reihani.dk\/index.php\/wp-json\/wp\/v2\/pages\/793"}],"wp:attachment":[{"href":"https:\/\/reihani.dk\/index.php\/wp-json\/wp\/v2\/media?parent=1437"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}