Water Transmission Lines:

  • Detailed design (implementation phase) of river training works in the Dareh Roud River
  • Design of water transmission lines from Dareh Tang to Maghar Dam, Ahar County
  • Phase III (high-level and site supervision) of the rehabilitation and reconstruction project of the feeder canal and main downstream irrigation network of Azadegan Dam, Ahar
  • Phase III (high-level and site supervision) of the water transfer project from Dareh Tang to Maghar Dam, Ahar County
  • Phase I and II studies for the design of the Tashtashi diversion weir on the Marduq Chay River
  • Phase II studies for the design of the drainage system of Shahid Salimi Industrial Town
  • Phase I and II studies for the surface water collection and conveyance project in Hashtrood Industrial Town
  • Studies and design of surface water management and flood conveyance in Hadi Shahr Industrial Town